
600/700 North Reconstruction
Salt Lake City is rebuilding 600/700 North from 800 West to Redwood Road through 2026. The Jordan River Bridge at 650 North will also be rebuilt during this time. The bridge work will close 600 North for up to 8 months.
To better plan your travel, sign up for project updates!
Contact Project Team
Hotline: 801-618-1003
Email: 600North@slc.gov

Project Update:
Work is currently taking place on the south side of 600 North between 1000 and 800 West. One travel lane in each direction is available on the north side of the road.
All major roadway work between Redwood Road and 800 West, including asphalt, asphalt bike path installation, driveway, curb and gutter, sidewalk, and storm drain replacement, is anticipated to be completed in early fall, with remaining items like landscaping, signage, and final electrical utility upgrades completed by the end of November.
Roadway Improvements Include:
- Repairing soft spots underneath the existing road
- Removing and replacing existing asphalt
- Replacing curb and gutter
- Upgrading storm drain trunk line
- Improving storm water runoff and drainage
- Adding curb-separated bike lanes on both sides of the street
- Adding mid-block crosswalks
- Adding new trees, protecting existing healthy trees, and creating a uniform look to parks trips along corridor
Phases
Construction between Redwood Road and 1000 West
Major roadwork items, including storm drain upgrades, curb and gutter, sidewalk, driveway, and asphalt replacement are largely complete between Redwood Road and 1200 West. Remaining activities, including asphalt bike path installation, landscaping, and some electrical utility installation, will take place through fall.

New pavement, upgraded sidewalks, and the asphalt bike path near Redwood Road are creating a safer, more comfortable experience for those walking, biking, and driving.
Upcoming and ongoing events
Past events
Event date: April 16th, 2025 at 11:00 PM to April 17th, 2025 at 1:00 AM.
601 North 1500 West
Event date: December 11th, 2024 from 12:30 AM to 2:00 AM.
601 North 1500 West
Event date: March 28th, 2024 at 11:30 PM to March 29th, 2024 at 1:00 AM.
601 North 1500 West
