600/700 North Reconstruction

Salt Lake City is rebuilding 600/700 North from 800 West to Redwood Road through 2026. The Jordan River Bridge at 650 North will also be rebuilt during this time. The bridge work will close 600 North for up to 8 months.

To better plan your travel, sign up for project updates!

Contact Project Team

Hotline: 801-618-1003

Email: 600North@slc.gov


A project map showing the completed, active, and future work on the 600/700 North Reconstruction Project.

Project Update:

Work is currently taking place on the south side of 600 North between 1000 and 800 West. One travel lane in each direction is available on the north side of the road.

All major roadway work between Redwood Road and 800 West, including asphalt, asphalt bike path installation, driveway, curb and gutter, sidewalk, and storm drain replacement, is anticipated to be completed in early fall, with remaining items like landscaping, signage, and final electrical utility upgrades completed by the end of November.

Roadway Improvements Include:

  • Repairing soft spots underneath the existing road
  • Removing and replacing existing asphalt
  • Replacing curb and gutter
  • Upgrading storm drain trunk line
  • Improving storm water runoff and drainage
  • Adding curb-separated bike lanes on both sides of the street
  • Adding mid-block crosswalks
  • Adding new trees, protecting existing healthy trees, and creating a uniform look to parks trips along corridor


Phases

Phases overview
Phase 3: Construction between Redwood Road and 1000 West
Construction between Redwood Road and 1000 West
Phase 4: Construction Between 800 West and 1200 West, Jordan River Bridge Reconstruction
Construction Between 800 West and 1200 West, Jordan River Bridge Reconstruction

Concept and Design

April 6, 2020 6:00 AM - March 9, 2024 7:00 AM

The 600/700 North Mobility, Safety, and Transit Improvements project builds on the 2021 Westside Connections Mobility Study and a 2023 community survey to make this Westside corridor safer and more accessible for people walking, biking, taking transit, and driving. With input from residents, stakeholders, and community leaders, the project team evaluated existing conditions, explored design options, and refined plans for future transit service and bus stops. The final design was completed and shared with residents at an open house on April 16, 2025, ahead of construction.


Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Event date: April 16th, 2025 at 11:00 PM to April 17th, 2025 at 1:00 AM.

      Location

      601 North 1500 West

    • Event date: December 11th, 2024 from 12:30 AM to 2:00 AM.

      Location

      601 North 1500 West

    • Event date: March 28th, 2024 at 11:30 PM to March 29th, 2024 at 1:00 AM.

      Location

      601 North 1500 West

    3 events have loaded.